TM 9-6150-226-13
WARNING
High voltage is present in this system. DISE and
PDISE supports equipment using 120/208 V ac. Do
not rely on the color of the wire insulation for
phase color-coding.
The insulation on the wires
inside the cable jacket may vary, depending on
the supplier.
Wires will be marked with colored
tape to designate the phases.
Perform a
continuity
test to
verify
correct
phase
designation in accordance with the colored tape.
NOTES :
1.
2.
3.
ALL DIMENSIONS ARE IN INCHES, WITH THE METRIC EQUIVALENT IN PARENTHESES.
CUT AND REMOVE CABLE AND WIRE INSULATION FROM CABLE ENDS AS INDICATED.
INSTALL P1 CONNECTOR ON PROPER CABLE ENDS SO WIRE COLORS AND SOCKETS MATCH
AS FOLLOWS:
4.
5.
6.
7.
COLOR
FROM
BLACK
RED
BLUE
WHITE
GREEN (OR BARE)
GREEN (OR BARE)
GREEN (OR BARE)
GREEN (OR BARE)
P1-A
P1-B
P1-C
P1-N
P1-G1
P1-G2
P1-G3
P1-G4
VERIFY ELECTRICAL CONTINUITY FOR EACH PATH WITH AN OHMMETER.
CRIMP SOCKETS TO CABLE WIRES.
ASSEMBLE P1 CONNECTOR SO KEYWAYS AND SOCKETS ALINE AS INDICATED.
MARK SLEEVES IN ACCORDANCE WITH MIL-M-60903 AS FOLLOWS:
97403-13226E7020
120/208 VAC
3 PHASE
100 AMP
FIGURE F-16.
100-amp, 4-ft (1.2m) pigtail cable. (sheet 3 of 3)
F-43
