TM 9-6115-730-10
HOW TO USE THIS MANUAL Continued
MAINTENANCE WORK PACKAGES
Read the INITIAL SETUP section carefully before you start any maintenance procedure. Get the tools and supplies listed
and the personnel needed.
TITLE
0013 00
CONTROL BOX ASSEMBLY MAINTENANCE
THIS WORK PACKAGE COVERS:
SUMMARY
Removal, Installation
INITIAL SETUP:
MAINTENANCE
REFERENCES
LEVEL
Maintenance Level
References
Operator
TM 9-6115-730-10
WP 0013 00
MATERIALS/PARTS
Tools and Special Tools
Materials/Parts
Tool kit and supplement, general
Corrosion preventive compound
TOOLS AND
(item 9, WP 0023 00)
SPECIAL TOOLS
Personnel Required
One
PERSONNEL
REQUIRED
LEGEND:
TITLE
The name of the procedure.
SUMMARY
A listing of the general actions to be performed.
MAINTENANCE LEVEL
The level of maintenance authorized to do the procedures.
TOOLS AND SPECIAL TOOLS
The tools and equipment needed to do the procedures.
PERSONNEL REQUIRED
The personnel needed to do the procedures.
REFERENCES
Other work packages, manuals, and publications needed to do the procedure.
MATERIALS/PARTS
The supplies and parts needed to do the procedures.
iv