TM 9-6115-664-13&P
Section VII. PREPARATION FOR SHIPMENT AND STORAGE
4-60. GENERAL.
This section provides instructions for short term and intermediate storage or shipment of the APU.
4-61. ADMINISTRATIVE STORAGE.
Administrative storage shall be in accordance with AR 750-1.
4-62. SHORT TERM STORAGE (30 days or less).
a.
Check engine oil level and service as required (Para. 4-1).
b.
Check that engine crank handle is securely stowed under APU enclosure.
c.
Conduct a general inspection of the unit to ensure all components are present and securely fastened. Close all
doors and lids and lock in position.
d.
Stow the APU on a level surface in an area protected from the elements. Cover as required depending upon
weather conditions.
4-63. INTERMEDIATE TERM STORAGE (more than 30 days).
a.
Start the APU (Para. 2-8) and operate for 10 minutes at full speed to bring engine to normal operating
temperature. Shutdown the APU.
b.
Drain the engine oil (Para. 4-1). Fill crankcase to proper level with preservative lubricating oil.
c.
Perform all MONTHLY PMCS requirements (Table 4-2).
d.
Close air intake and exhaust openings with moisture proof tape.
e.
Stow the APU on a level surface in an area protected from the elements. Cover as required depending upon
weather conditions.
f.
Before returning APU to service, drain preservative oil and service the engine (Para. 4-1).
4-64. SHIPMENT.
a.
Close air intake and exhaust openings with moisture proof tape.
b.
Attach to the APU all forms, tags, and records applicable to the unit.
c.
Load APU onto carrier and attach shipping tiedowns.
4-132
