ARMY TM 9-6115-645-24
AIR FORCE TO 35C2-3-444-12
MARINE CORPS TM 09244A/09245A-24/2
2-32.4 Installation.
a.
Connect electrical leads to MASTER SWITCH (5, FIGURE 2-13) and remove tags.
b. Insert MASTER SWITCH (5) into control panel.
c.
Install screws (4) and nuts (3).
d. Install knob (2) and tighten set screw (1).
2-33 ETHER SWITCH.
233.1
a.
b.
2-33.2
a.
b.
c.
d.
e.
f.
2-33.3
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
2-33.4
a.
b.
c.
d.
e.
Inspection.
Shut down generator set.
Inspect switch for loose connections and mounting, and other damage.
Removal.
Shut down generator set.
Open battery access door and disconnect negative battery cable.
Release Control panel by turning two fasteners and lower control panel slowly.
Tag and disconnect ETHER switch (8, FIGURE 2-13) electrical leads.
Remove nut (6) and washer (7).
Remove ETHER switch (8) from control panel and remove tab washer (9).
Testing.
Shut down generator set.
Open battery access door and disconnect negative battery cable.
Release control panel by turning two fasteners and lower control panel slowly.
Tag and disconnect ETHER switch (8, FIGURE 2-1 3) electrical leads.
Set multimeter for ohms and connect across ETHER switch terminals. Multimeter should indicate open circuit.
Hold ETHER switch in ON position. Multimeter should indicate continuity.
Replace ETHER switch if indications are not as above.
Connect electrical leads to ETHER switch (8) and remove tags.
Raise and secure control panel.
Connect negative battery cable and close battery access door.
Installation.
Install tab washer (9, FIGURE 2-13) and insert ETHER switch (8) into control panel.
Install washer (7) and nut (6).
Connect electrical leads and remove tags.
Raise and secure control panel.
Connect negative battery cable. Close battery access door.
2-64