ARMY TM 9-6115-643-24
AIR FORCE TO 35C2-3-445-22
2.60.3. Installation.
a. Install governor control unit (56, FIGURE 2-14) with screws (55).
b. Connect electrical leads and remove tags.
c. Install control box top panel, paragraph 2.15.4.
d. Connect negative battery cable. Close battery access door.
2.61. CONTROL BOX HARNESS.
2.61.1. Inspection.
a. Shut down generator set.
b. Inspect control box harness (57, FIGURE 2-14) wiring for breaks, damaged insulation, and loose or damaged ter-
minals.
2.61.2. Testing.
a. Shut down generator set.
b. Open battery access door and disconnect negative battery cable.
c. Remove control box top panel, paragraph 2.15.1.
d. Set multimeter for ohms, and using Wiring Diagram FO-2 as a guide, check wires for continuity.
e. If no repair is needed, install control box top panel, paragraph 2.15.4, connect negative battery cable, and close
battery access door.
2.61.3 Repair.
a. Replace individual wires, damaged terminal ends, clamps, and tie wraps.
b. Ensure proper connection of wires not indicating continuity.
2.62. DIAGNOSTIC CONNECTOR.
N O TE
The diagnostic connector can be used as an aid in troubleshooting. Re-
fer to FIGURE 2-17 and TABLE 2-9.
N O TE
Diagnostic connector is a component of the control box harness assem-
bly, but can be removed and installed separately as follows.
2-94