ARMY TM 9-6115-643-24
AIR FORCE TO 35C2-3-445-22
b. Open battery access door and disconnect negative battery cable.
c. Release control panel by turning two fasteners and lower control panel slowly.
d. Tag and disconnect PARALLEL-UNIT switch (27, FIGURE 2-13) electrical leads.
e. Remove nut (25) and washer (26).
f. Remove PARALLEL-UNIT switch (27) from control panel and tab washer (28) from switch stem.
2.37.3. Testing.
a. Shut down generator set.
b. Open battery access door and disconnect negative battery cable.
c. Release control panel by turning two fasteners and lower control panel slowly.
d. Tag and disconnect PARALLEL-UNIT switch (27, FIGURE 213) electrical leads.
N O TE
Refer to Wiring Diagram FO-2 for terminal positions.
e. Place switch in PARALLEL position.
f. Set multimeter for ohms and check for continuity between terminals 1 and 2,4 and 5,7 and 8, and 10 and 11.
g. Place switch in UNIT position.
h. Check for continuity between terminals: 2 and 3, 5 and 6, 8 and 9, and 11 and 12.
i. Replace switch if any open circuit is indicated.
j. Connect electrical leads to switch (27) and remove tags.
k. Raise and secure control panel.
l. Connect negative battery cable and close battery access door.
2.37.4. Installation.
a. Install tab washer (28, FIGURE 2-13) and insert PARALLEL-UNIT switch (27) into control panel.
b. Install washer (26) and nut (25).
c. Connect electrical leads and remove tags.
d. Raise and secure control panel.
e. Connect negative battery cable. Close battery access door.
2.38.
AM-VM TRANSFER SWITCH.
2.38.1. Inspection.
a. Shut down generator set.
b. Inspect switch for loose connections and mounting, and other damage.
2.38.2. Removal.
a. Shut down generator set.
b. Open battery access door and disconnect negative battery cable.