TM 5-6115-628-14&PCHAPTER 4UNIT MAINTENANCESection I. SERVICE UPON RECEIPT OF EQUIPMENT4-1.Inspecting and Servicing Equipment. The power plant is unpacked, inspected, and serviced asdescribed in the following paragraphs. Unpacked equipment must be checked against the EquipmentPacking List to ensure completeness. Discrepancies must be reported in accordance with instructionsin DA Pam 738-750.a. UnpackingPowerPlant. (See figures 4-1 and 4-2.) The two power units that makeup theAN/MJQ-15 power plant are identical except for the addition of the switch box installed on the curbsidefender of one of the units. Therefore, the unpacking procedures are typical for both. Each generatorset is packed in place on its respective trailer. Before beginning the unpacking procedure, locate andremove Depreservation Guide.Figure 4-1. Power Unit B, with Switch Box, Packed for Shipment.WARNINGThe steel banding used in packaging of power plant has sharp edges. Careshould be taken when cutting and handling banding to avoid injury topersonnel.(1) Remove steel banding around plywood box(es) covering generator set and, whenunpacking unit B, the switch box.4-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business