TM 5-6115-365-15
C1
1
Screw
15 Preformed packing
29 Hexnut
2
Lockwasher
16 Light and wire assembly
30 Lockwasher
3
Flat washer
17 Lens
31 Flatwasher
4
Cover
18 Lamp
32 Electrical lead
S
Gasket
19 Screw
33 Flat washer
6
Screw
20 Hexnut
34 Hex nut
7
Flat washer
21 Lockwasher
35 Lockwasher
8
Lockwasher
22 Electrical lead
36 Terminal board
9
Hexnut
23 Fastener
37 Gasket
10 Screw
24 Screw
38 Terminal lug
11 Knob
25 Flat washer
39 Locknut
12 Transfer switch
26 Hex nut
40 Stuffing tube assembly
13 Hex nut
27 Lockwasher
41 Transfer switch box
14 Lockwasher
28 Flat washer
42 Rivet
Figure 2-5. Continued.
Section IV. ORGANIZATIONAL MAINTENANCE INSTRUCTIONS
2-9. Transfer Switch Indicating Lights
a.
Removal. Remove the indicating lights as
illustrated in figure 2-5.
b.
Installation. Install the indicator or lights as
illustrated in figure 2-5.
2-10. Ground Wires and Terminal Stud
a.
Removal. Remove the ground wires from the
ground terminal and generator sets as shown in figure
2-2. Remove the terminal stud.
b.
Installation. Install the ground wires, and
terminal stud as shown in figure 2-2.
Section V. DIRECT AND GENERAL SUPPORT AND DEPOT
MAINTENANCE INSTRUCTIONS
2-11. Generator Transfer Switch
a.
Removal and Disassembly.
(1)
Tag and disconnect leads from the output
terminals to load.
(2)
Remove and disassemble the transfer
switch as illustrated in figure 2-5.
b.
Reassembly and Installation.
(1)
Reassemble and install the transfer switch
as illustrated in figure 2-5.
(2)
Connect load connections. (Refer to fig. 2-6).
2-12. Generator Sets
a.
Removal. Using figure 2-7 as a guide, perform
the following steps:
(1)
Disconnect fuel lines.
(2)
Disconnect electrical leads and cables.
(3)
Disconnect oil drain adapters.
(4)
Remove 8 bolts that secure the two
generator sets to the trailer and remove the generator
sets.
b.
Installation. Using figure 2-7 as a guide, perform
the following steps:
(1)
Secure the two generator sets to the
trailer bed with 8 bolts.
(2)
Connect the oil drain adapters.
(3)
Connect the electrical leads and cables.
(4)
Connect fuel lines.
2-11