TM 9-6115-730-24
0073
REMOVAL
1. Ensure generator set is fully stopped, ENGINE CONTROL switch is OFF/RESET, Battery Disconnect Switch is
OFF, and DEAD CRANK SWITCH is OFF before proceeding.
2. Open left front doors.
3. Disconnect wire harness connector ENG-P13 from injector valve (Figure 1, Item 1).
4. Disconnect tubing (Figure 1, Item 2) from injector valve (Figure 1, Item 1).
5. Loosen clamp (Figure 1, Item 3) and remove ether bottle (Figure 1, Item 4) and immediately install cap
(Figure 1, Item 5).
6. If necessary, remove two screws (Figure 1, Item 6), washers (Figure 1, Item 7), and clamp (Figure 1, Item 3).
7. If necessary, remove two screws (Figure 1, Item 12) washers (Figure 1, Item 13), retaining clamp (Figure 1,
Item 10) and injector valve (Figure 1, Item 1).
8. If necessary, remove two screws (Figure 1, Item 8), washers (Figure 1, Item 9), and valve mounting bracket
(Figure 1, Item 11).
INSTALLATION
1. If removed, install valve mounting bracket (Figure 1, Item 11), two washers (Figure 1, Item 9),and screws
(Figure 1, Item 8).
2. If removed, install injector valve (Figure 1, Item 1) and retaining bracket (Figure 1, Item 10) with two washers
(Figure 1, Item 13) and screws (Figure 1, Item 12).
3. If removed, install clamp (Figure 1, Item 3), two washers (Figure 1, Item 7), and screws (Figure 1, Item 6).
4. Remove cap (Figure 1, Item 5), and immediately install ether bottle (Figure 1, Item 4). Tighten clamp
(Figure 1, Item 3).
5. Connect tubing (Figure 1, Item 2) to injector valve (Figure 1, Item 1).
6. Connect wire harness connector ENG-P13 to injector valve (Figure 1, Item 1).
7. Close left front doors.
0073-2