TM 9-6115-730-24
0048
REMOVAL - Continued
NOTE
Cut tiedown straps as required.
3. Partly remove load terminal board assembly (Figure 1, Item 1) (WP 0046) sufficiently to gain access to rear of
load terminal board assembly.
4. Partly remove reconnection terminal board (Figure 1, Item 2) (WP 0045) sufficiently to gain access to rear of
reconnection terminal board.
5. Remove two plates from front of main load contactor (Figure 1, Item 3) (WP 0049) to gain access to cable
terminals on front of main load contactor.
6. Tag and disconnect cable 110K (Figure 1, Item 4) from terminal 10 on reconnection terminal board (Figure 1,
Item 2) and terminal N on load terminal board assembly (Figure 1, Item 1).
7. Tag and disconnect cable 110L (Figure 1, Item 5) from terminal 12 on reconnection terminal board (Figure 1,
Item 2) and terminal N on load terminal board assembly (Figure 1, Item 1).
NOTE
Except for cables 110K and 110L, all power cables are installed in pairs.
8. Tag and disconnect cables 101A and 101B (Figure 1, Item 6) from terminal 1 on reconnection terminal board
(Figure 1, Item 2) and from two terminals A1 on main load contactor (Figure 1, Item 3).
9. Tag and disconnect cables 102A and 102B (Figure 1, Item 7) from terminal 2 of reconnection terminal board
(Figure 1, Item 2) and from two terminals B1 on main load contactor (Figure 1, Item 3).
10. Tag and disconnect cables 103A and 103B (Figure 1, Item 8) from terminal 3 on reconnection terminal board
(Figure 1, Item 2) and from two terminals C1 on main load contactor (Figure 1, Item 3).
11. Tag and disconnect cables 121A and 121B (Figure 1, Item 9) from two terminals A2 on main load contactor
(Figure 1, Item 3) and from two terminals L1 on load terminal board (Figure 1, Item 1).
12. Tag and disconnect cables 122A and 122B (Figure 1, Item 10) from two terminals B2 on main load contactor
(Figure 1, Item 3) and from two terminals L2 on load terminal board (Figure 1, Item 1).
13. Tag and disconnect cables 123A and 123B (Figure 1, Item 11) from two terminals C2 on main load contactor
(Figure 1, Item 3) and from two terminals L3 on load terminal board (Figure 1, Item 1).
END OF TASK
INSTALLATION
NOTE
Install tiedown straps as required.
1. Remove tags and connect cables 123A and 123B (Figure 1, Item 11) to two terminals L3 on load terminal
board (Figure 1, Item 1) and to two terminals C2 on main load contactor (Figure 1, Item 3).
0048-3