d.
Remove nut (15), serrated lock washer (16), washer (17) and grounding cable (18) from
grounding stud (19). Put washer (17) and serrated lock washer (16) back on, and screw nut
(15) on temporarily.
e.
Remove nut (20), serrated lock washer (21), washer (22) and grounding cable (23) from
grounding stud (24). Put washer (22) and serrated lock washer (21) back on, and screw nut
(20) on temporarily.
a.
Ensure whether plugs on plug connection panel (9) fit securely and are not charred.
b.
Ensure whether the cover caps are easy to thread onto the plugs.
c.
Ensure whether the hinged socket covers close properly.
WARNING
Never attempt to connect control or power cables while the
Generator Set 150 kW is running. Failure to observe this
warning could result in severe personal injury or death by
electrocution.
a. Connect control cable:
NOTE
All cable connections must be secure.
(1) Unscrew protective cap (4) from plug of control cable (1).
(2) Unscrew protective cap (3) from socket (2).
(3) Plug control cable (1) into socket (2) and tighten down.
(4) Screw protective caps (3, 4) for socket and plug to one another.
b.
Connect power cables (5, 6, 7, 8) using the same procedure as for the control cable.
NOTE
l
If U. S. Standard Grounding Assembly is used for grounding, connect
grounding cable (27) to grounding connector (26).
l
If grounding cables are to attach on grounding bar (26) do steps c. to e.
c.
After removing parts (20 to 22) from grounding stud (24), install grounding cable (23), washer
(22), serrated lock washer (21), and nut (20). Tighten nut (20).
d.
After removing parts (16 to 17) from grounding stud (19), install grounding cable (18), washer
(17), serrated lock washer (16) and nut (16). Tighten nut (16).
e.
After removing parts (10 to 12) from grounding stud (14), install grounding cable (13), washer
(12), serrated lock washer (11) and nut (10). Tighten nut (10).
4-43